Project Name: Elsie Allen High School and Maria Carillo High School

Location: Santa Rosa, California

Contractor: Wright Contracting (Elsie Allen) and Lathrop Construction (Maria Carillo)

Link: http://eahs.srcs.k12.ca.us and http://www.mchs.srcs.k12.ca.us

Description: These two high schools were built to house the fast growing population of Santa Rosa. The first one built was Elsie Allen High School and then Maria Carillo High School followed very shortly. Each of these schools is approximately 100,000 square feet.

Systems:

  • Lighting: Combination of linear lighting and 2x4 recessed parabolic fixtures throughout the two buildings and stage and house lighting for the Auditorium. Relay panels connected to the existing network timeclock for the campus controlled the building lighting. The Auditorium has two dimmer racks and a control console in the control booth.
  • Power: 480-volt and 208-volt distribution throughout the building.
  • Telecommunications: Complete data, telephone and CATV systems.
  • Signal: Fire alarm, security, public address and clock.




Home | Current Work | Portfolio | Cabling | About Us | Links | Contact Us